Lake Simcoe shoreline rules: the Plan, LSRCA and setbacks
Lake Simcoe shoreline work falls under the Lake Simcoe Protection Plan and LSRCA permits. What's regulated, the 30 m and 100 m zones, fees and timelines.
By Jordan Rossman, REALTOR®, Sales Representative
Updated · 8 min read
The short answer
Building, grading or altering the shore on Lake Simcoe is controlled by the Lake Simcoe Protection Plan (in effect since June 2, 2009) and by Lake Simcoe Region Conservation Authority permits under Ontario Regulation 41/24, plus your municipality's zoning. The Plan sets a minimum 30-metre vegetation protection zone in shoreline built-up areas and 100 metres elsewhere outside settlement areas. If a property is in a regulated area, you need an LSRCA permit before the building permit.
- Lake Simcoe Protection Plan in effect
- June 2, 2009, under the Lake Simcoe Protection Act, 2008
- Shoreline vegetation protection zone
- 30 m in shoreline built-up areas; 100 m outside settlement and built-up areas
- LSRCA regulation
- O. Reg. 41/24, in force April 1, 2024
- Permit timelines (provincial)
- Completeness confirmed within 21 days; decision within 90 days of a complete application
- LSRCA jurisdiction
- The whole Lake Simcoe watershed except the City of Orillia and the Upper Talbot River subwatershed
On Lake Simcoe, the house is only half the purchase. The other half is what you'll be allowed to do between the house and the water: add a deck, replace a crumbling wall, put up a boathouse, or tear down the cottage and rebuild. Those answers come from three layers of rules that stack on top of each other, and a permit from one never replaces a permit from another.
This page covers the land-side rules. For the dock and boathouse paperwork in the water, see docks, boathouses and permits. For the township-by-township septic programs and shore road allowances, rossmanteam.com already has detailed guides on septic inspections and shore road allowances.
Which rules apply to a Lake Simcoe shoreline?
| Layer | Who administers it | What it controls |
|---|---|---|
| Lake Simcoe Protection Act, 2008 and Lake Simcoe Protection Plan | Province of Ontario; applied by municipalities, the LSRCA and ministries | Vegetation protection zones, shoreline alteration, structures in the lake |
| Ontario Regulation 41/24 under the Conservation Authorities Act | Lake Simcoe Region Conservation Authority (LSRCA) | Permits for development and site alteration in regulated areas near the lake, creeks, wetlands and hazard lands |
| Zoning by-law and building permits | Your municipality (Barrie, Oro-Medonte, Ramara or Orillia) | Setbacks, size limits, building code |
| Federal fisheries and navigation rules | Fisheries and Oceans Canada, Transport Canada | Anything below the high-water mark |
The Plan took effect on June 2, 2009. Most of its shoreline policies are "designated policies," which means planning decisions, conservation authority permissions and several other provincial approvals must conform to them. In practice, you rarely deal with the Plan directly. You meet it when the township or LSRCA reviews your application.
What is the vegetation protection zone, and how wide is it?
The Plan's core shoreline tool is a strip of natural vegetation along the lake that it wants kept, or restored, as natural self-sustaining vegetation. How wide depends on where the lot sits:
| Where the property is | Minimum vegetation protection zone from the Lake Simcoe shoreline |
|---|---|
| A "shoreline built-up area" (shoreline areas outside settlement areas that were already built up, or designated and zoned for concentrated development, when the Plan took effect) | 30 metres, or more if an evaluation says so |
| Remaining shoreline outside settlement areas and outside shoreline built-up areas | 100 metres |
| Inside a settlement area (a town, village or hamlet designated in the official plan) | No fixed zone; applications should establish or widen the zone to at least 30 metres where feasible |
The "shoreline" itself is defined in the Plan as the natural water mark that has left a visible difference in vegetation or soil, not the property line and not wherever the water happens to be in August.
Two more distances matter. In a shoreline built-up area, a development application within 120 metres of the lake needs a natural heritage evaluation. Outside settlement areas, anything within 240 metres has to show it keeps wildlife corridors along and back from the shore working.
Can I still build, add on or rebuild inside that zone?
Usually, if the use is already there. The Plan protects lawful uses that existed the day before it came into force, and it allows a new building on an existing lot of record that was zoned for it at that date. Expansions to existing buildings, accessory structures and uses are allowed as long as they don't extend into the vegetation protection zone. If there is truly no alternative, the expansion must be limited in scope and kept close to the existing structure.
Inside the zone, structures are allowed only when there is no other place to put them, the footprint is minimized, the zone's ecological function is maintained, and pervious materials are used where feasible. If vegetation is removed for permitted work, it must be re-established as far as feasible afterward.
What does the Plan say about walls, fill and structures in the water?
Three policies come up constantly on waterfront files:
- Significant alteration of the shore is not permitted unless it is to stabilize, protect, restore or rehabilitate the shore, or a public body does it consistently with the Plan. "Significant" means anything that harms the shoreline's ecological function.
- No structures in the lake, including boathouses, if they block the natural flow of water along the shore, are meant to be lived in, or harmfully alter fish habitat.
- Erosion control should use natural treatments such as planting and bioengineering that keep the natural contour of the shore, where practical, with a vegetated strip behind.
That last point is why a straight like-for-like replacement of an old concrete or armourstone wall is not a given. Expect to discuss softer options.
When do I need an LSRCA permit?
If the property is in an LSRCA regulated area, you need permission for:
- constructing, reconstructing, placing or enlarging any building or structure, or changing its use or adding units
- site grading
- placing, dumping or removing fill, from on site or elsewhere
- straightening, diverting or interfering with a creek or watercourse
- changing or interfering with a wetland
The LSRCA says that in regulated areas you must get its permit before you apply for a building permit. Check the property on the LSRCA's interactive regulation map, which is updated annually; the 2026 update was expected by the end of November 2026.
What do LSRCA permits cost in 2026?
The LSRCA's 2026 fee schedule took effect April 1, 2026. For private residential properties:
| Permit type | 2026 fee |
|---|---|
| Routine (limited review, minor in nature) | $624 |
| Minor (low risk, no technical reports) | $780 |
| Intermediate (detailed plans or reports, e.g. shoreline bioengineering, replacement structures) | $2,013 |
| Major (high-risk area, technical studies) | $6,018 |
| Legal or real estate inquiry | $547 |
| Retroactive permit (work already done) | Listed as "25% of original fee; up to 3× fee with non-compliance" |
The legal and real estate inquiry is worth knowing about as a buyer: it is how you ask the LSRCA what it has on file for a property. Fees are set annually, so confirm the current number before you budget.
How long does it take?
Ontario requires conservation authorities to confirm within 21 days whether an application is complete. Once it is complete, you should get a decision within 90 days. If you don't, or if you disagree with a refusal or conditions, you can appeal to the Ontario Land Tribunal. The LSRCA says a hearing before its board is required before an application is refused or approved with conditions.
Those are outside limits, not targets for a summer project. Add the township's building permit and any federal steps after that. Starting in fall or winter for work the following summer is realistic.
Is Orillia different?
Yes. The LSRCA's jurisdiction covers the whole Lake Simcoe watershed except the City of Orillia and the Upper Talbot River subwatershed. Orillia waterfront near the Atherley Narrows is still under the Lake Simcoe Protection Plan, but there is no LSRCA permit. Instead, Ontario says that where a property is in the Lake Simcoe watershed but outside LSRCA jurisdiction, a Ministry of Natural Resources work permit is required to build, change, maintain, repair or replace an erosion control structure. See Atherley and the Orillia end for the boundary details.
What about township zoning?
Every municipality adds its own setbacks and size limits. As one example, Oro-Medonte's current Zoning By-law 97-95 requires a 20-metre rear yard setback from the average high-water mark of Lake Simcoe in its Shoreline Residential zone, and caps a boathouse and deck at 70 square metres combined; a 2025 minor variance notice for a Woodland Drive property lays both out. Oro-Medonte is replacing that by-law, so check the current version. Barrie, Ramara and Orillia each have their own numbers.
Will the conservation authority change?
Possibly the name on the form. Ontario plans to consolidate conservation authorities into nine regional authorities, taking effect in early 2027, and says permitting is meant to continue without interruption. The permit requirement comes from the Conservation Authorities Act and Ontario Regulation 41/24, so plan on needing approval either way.
How Jordan can help
Before you write an offer on Lake Simcoe, Jordan can help you pull the right questions together: whether the lot is in a regulated area, which structures have permits, and what the setbacks mean for the addition or rebuild you have in mind. He'll point you to the LSRCA, the township and your lawyer for the answers that need to be in writing.
Questions?
Get a straight answer from a local REALTOR®.
Ask Jordan anything — no scripts, no pressure, just local knowledge.

Jordan Rossman
REALTOR®, Sales Representative, Real Broker Ontario Ltd.
Questions people ask
Do I need an LSRCA permit to work on my Lake Simcoe shoreline?
If the property is in an LSRCA regulated area, yes, for building or placing structures, grading, placing or removing fill, and altering a watercourse or wetland. Check the LSRCA's interactive regulation map, then call its permits team at 905-895-1281 to confirm.
How far back from Lake Simcoe do I have to build?
The Lake Simcoe Protection Plan sets a minimum 30-metre vegetation protection zone in shoreline built-up areas and 100 metres for the rest of the shoreline outside settlement areas. Municipal zoning adds its own setback; in Oro-Medonte's Shoreline Residential zone, for example, it is 20 metres from the average high-water mark.
How long does an LSRCA permit take?
Ontario requires conservation authorities to confirm within 21 days whether an application is complete, and to decide within 90 days of a complete application. If they don't, you can appeal to the Ontario Land Tribunal.
Can I expand an existing cottage close to the lake?
Often, yes. The Plan permits expansions of existing buildings, provided they don't push into the vegetation protection zone unless there is no alternative, in which case the expansion must be limited and kept close to the existing structure.
Does the LSRCA regulate shoreline work in Orillia?
No. The LSRCA's jurisdiction excludes the City of Orillia. Ontario says that inside the Lake Simcoe watershed but outside LSRCA jurisdiction, building, changing or repairing an erosion control structure needs a Ministry of Natural Resources work permit.
Sources · checked November 9, 2026
- 1.Lake Simcoe Protection Plan — Government of Ontario
- 2.Lake Simcoe Protection Plan, Chapter 6: Shorelines and Natural Heritage — Government of Ontario
- 3.Lake Simcoe Protection Plan, Appendix (definitions and designated policies) — Government of Ontario
- 4.Permits — Lake Simcoe Region Conservation Authority
- 5.Do I Need a Permit? — Lake Simcoe Region Conservation Authority
- 6.2026 Fee Schedule — Lake Simcoe Region Conservation Authority
- 7.About LSRCA — Lake Simcoe Region Conservation Authority
- 8.Permits under the Conservation Authorities Act — Government of Ontario
- 9.Crown land and shore land work permits — Government of Ontario
- 10.Notice of Public Hearing, Application 2025-A-29 (817 Woodland Drive) — Township of Oro-Medonte
- 11.Improving Ontario's conservation authority system (backgrounder, March 2026) — Government of Ontario
Rules, rates and programs change. This guide is general information, not legal, tax or financial advice — confirm specifics with the municipality, your lawyer or your accountant. Spot something out of date? Tell Jordan.